Wet ground
Plant hire for wet and soft ground.
Tracked dumpers, steel road plates and pumps for soft, sloping or waterlogged sites, with honest advice on what the ground will take. From our yard near Thirsk.
- Tracked dumpers
- 0.5T to 5T
- Ground cover
- 8 x 4 steel road plates
- Dewatering
- 2 inch and 3 inch pumps
- Honest
- Tell us how soft it is
Tracked, not wheeled
Tracked dumpers for soft and wet ground.
Wheels dig in; tracks spread the weight and grip. These are the tracked dumpers in the fleet; more on tracked dumper hire.
| Machine | Width | Weight | Good for |
|---|---|---|---|
| Tracked barrow 0.5T | 690mm | 475kg | Paths, steps and tight, soft runs |
| C12R tracked dumper 1.25T | 960mm | 1,100kg | Soft lawns, slopes, small sites; 3-way tip |
| C30R tracked dumper 3T | 1,390mm | 2,865kg | Frame turns 90 degrees left and right |
| C50R tracked dumper 5T | 2,200mm | 5,940kg | Heavier loads; 360 degree spin turn in 7 seconds |
Dimensions are a guide from our October 2026 hire brochure.

Protect the ground
Mats, plates and a dry hole.
On a soft site the machine is only half of it. The pond-edge job shown here had an excavator working on timber; for a path across a verge or a corner of lawn, steel road plates (8 x 4, with lifting holes) spread the load and stop ruts. And if the ground is wet because the hole is, a pump keeps the dig workable.
Be straight with us about how soft it is. If it will not take a machine without mats, say so before you book; if you're not sure, tell us what it's like underfoot and we'll say what we'd send.
Choosing
Quick guide.
- Soft lawn or garden. A tracked barrow or the 1.25T tracked dumper, and boards under any turn. A micro or mini digger to dig.
- Sloping or muddy site. A tracked dumper (3T or 5T for bigger loads); keep to one route and keep plates on the worst section.
- Standing water. A pump first, with a generator if there is no mains.
- Very soft ground. Tell us the conditions and the job; we'll say honestly what we'd send and what might need extra ground protection.
Questions
Good to know.
Do you have a machine for really boggy ground?
We hire tracked dumpers and mostly tracked excavators, with steel plates to protect the ground. If your site is very soft, tell us the conditions and we'll say honestly whether what we list will work.
Are the diggers tracked?
Most of our excavators are tracked machines. Tell us the ground and the job and we'll confirm the best one.
What are road plates?
Heavy steel plates (8 x 4, with lifting holes) laid on the ground to spread the load of a machine or vehicle.
Can I hire a pump for a flooded trench?
Yes. A 2 inch submersible (238 litres a minute, 10m head) and a 3 inch centrifugal (717 litres a minute, 23m head). See water pump hire.
Soft site?
Describe the ground and the job.